Figure 28. Installing the inner rail
Attention: There are "L" and "R" logos marked on the front of inner rails which represent the left
rail and the right rail. Ensure correct rails are installed to the rack accordingly.
a.
Align the mounting holes on the inner rail with the corresponding rail mounting pins on the
side of the server.
b.
Push the inner rail as shown until the mounting pins on the server are locked in place.
c.
Tighten M3.5 screws to secure the inner rail to the server.
Note: The number of screws for each inner rail varies by the rail kit and the depth of EIA
brackets. See the depth mark on the side of chassis to identify the depth of EIA brackets, and
refer to the following information for screw locations.
Figure 29. Depth mark for EIA brackets
.