Figure 138. Installing PCIe riser 1
Step 5.
Manage the signal cables.
a.
Manage the blue signal cable into the space between the processor air baffle and the
chassis.
Note: Make sure that the blue signal cable does not cover the guide slot for the top cover.
b.
Manage the silver signal cable into the space between PCIe riser 1 and the chassis.
Figure 139. Managing PCIe riser 1 signal cables
Step 6.
If applicable, manage all the GPU power cables into the cable guide of the processor air baffle.
158
ThinkEdge SE455 V3 User Guide