The preferred installation method for the Innova LC/LP Positioner or the Omega tables is through-
bolting. The through-bolting method can be used in all seismic zones. If through-bolting cannot be
used, use provided floor anchors instead.
Illustration 3-3: Through–Bolt Supplied (Slab Type Floor Construction)

3.3.2 Floor requirements when using provided floor anchors

The maximum pullout force per provided anchor was calculated assuming:
A concrete compression strength of 17.24 MPa at 28 days (which is the minimum required
compression strength).
Anchors installed to the required hole depth of 165.1 mm (6.5 in) minimum, and
Center of anchor hole to concrete edge distance 79.4 mm (3.12 in).
Make sure to obtain data on compression strength of the concrete before using floor anchors.

3.3.3 Pan Type Floor Construction Requirement

For Pan type floor construction, steel channels must be designed by a local structural engineer to
span floor joists. See
Chapter 3 Physical Requirements of room
Innova 2121-IQ/3131-IQ Biplane Cardiovascular Imaging System Pre-Installation Manual
Illustration
3-4.
Illustration 3-2:
Direction 5177951-4-1EN, Revision 1