GE Innova 2121-IQ Biplane Preinstallation Manual page 33

Cardiovascular imaging system
Table of Contents

Advertisement

GE Healthcare
Chapter 2 Innova System
Innova 2121-IQ/3131-IQ Biplane Cardiovascular Imaging System Pre-Installation Manual
NOTICE
General safety instructions
Move the UPS in an upright position in its original package to the final
destination room.
To lift the cabinets, use a forklift or lifting belts with spreader bars.
Check for sufficient floor and elevator loading capacity.
Check the integrity of the UPS equipment carefully.
If you notice visible damage, do not install or start the UPS. Contact the nearest
Service Center immediately.
WARNING! RISK OF ELECTRICAL SHOCK: Do not remove covers; there are
no user serviceable parts inside.
All installation, maintenance and service work should be performed by qualified
service personnel.
The UPS contains its own energy source (battery).
The field–wiring terminals may be electrically live, even when the UPS is
disconnected from the utility.
Dangerous voltages may be present during battery operation. The battery must
be disconnected during maintenance or service work.
This UPS contains potentially hazardous voltages.
Be aware that the inverter can restart automatically after the utility voltage is
restored.
Direction 5177951-4-1EN, Revision 1
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3131-iq biplane

Table of Contents