Ethernet Network Requirement - GE Innova 2121-IQ Biplane Preinstallation Manual

Cardiovascular imaging system
Table of Contents

Advertisement

GE Healthcare
The country specific power cords are pre-selectable in the GTC.

6.5 Ethernet Network Requirement

The IVUS CPU located in the control room shall be connected to the hospital Ethernet network. A
wall Ethernet outlet shall be available in the control room to connect the device.
DICOM Image Storage:
Saving patient cases to DVD: The archived images are stored in DICOM format with Volcano s5i
system acting as a File Set Creator (FSC), following the guidelines in the 2004 DICOM 3.0
specification.
Sending patient cases to DICOM server: The Volcano s5i supports the ultrasound multi-frame
image storage SOP class as an SCU (service class user).
NOTE:
All this applies to the IVUS mode of the s5i/GE, not for the FFR mode.
For more information, see the Volcano s5 DICOM Conformance Statement located in the
806365-005 Volcano Service Manual.
166
Innova 2121-IQ/3131-IQ Biplane Cardiovascular Imaging System Pre-Installation Manual
NOTICE
The IVUS Isolation Transformer will be connected to a standard hospital outlet.
There is no grounding requirement specified at site preparation.
Direction 5177951-4-1EN, Revision 1
6 IVUS Rev 2 Option

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3131-iq biplane

Table of Contents