Locate the position of the IVUS components in the Control Room, according to the workflow
requirement of the operators.
•
Establish a 76 mm (3") conduit below floor from the IVUS CPU location in the Control Room,
to the foot end area of the Patient Table in the Procedures Room:
○
Locate the Procedures Room exit of the conduit close to the centerline of the Patient Table
○
Locate it as close to the Patient Table base as possible, considering :
■
Room for access to the table for service purposes
■
Limitation from other cables connected to the table
■
Location of the table plate
■
Location of Mac-Lab conduit
■
Location of Physio or Med Gases connections
■
The IVUS cables are moving cables, they have to allow the Patient Table motions
(Panning, Lifting and Rotating)
•
Use similar solutions (i.e. protection against cleaning fluids, etc. ) as it is used for the Mac-Lab
conduit
•
See also guidance on Typical Layout drawing 4-58f sheets E1 and S2, showing Mac-Lab and
P/M Gas location recommendations.
6.3 Run Interconnection cables through the Conduit
Use the IVUS Rev 2 PIM (#806365002) as reference to the procedures below.
•
Unpack , and check the completeness of the Preinstallation kit :
○
1 pcs - Custom PIM cable 30 m (98 ft, 5 in) - Volcano ID :806452001
○
1 pcs - CAT5 cable 30 m (98 ft, 5 in) - Volcano ID :807055001
○
1 pcs - Custom Twin axial cable - Volcano ID :806380001
○
1 pcs - Ground Cable, 30 m (98 ft, 5 in) s5i – Volcano ID :806889001
○
1 pcs - IVUS Rev 2 Preinstallation Manual - Volcano ID :806365002
•
Install 806889001 Ground Cable through the Control Booth conduit (see note)
•
Install the cables through the IVUS conduit from the Control Room end :
○
806452001 PIM cable, round shaped connector end to the Procedures Room
○
807055001 - Ethernet cable (1 pcs)
•
Install the optional cables through the IVUS conduit from the Control Room end :
○
806380001 - ECG cable in case, if NON Mac-Lab ECG will be installed
○
808631002 – FFR cable option - 15m
○
808632002 – FFR cable option - 27m
NOTE:
NOTE:
164
Innova 2121-IQ/3131-IQ Biplane Cardiovascular Imaging System Pre-Installation Manual
For the ground cable, see the IVUS Rev 2 service manual for special instructions
concerning cable running and cutting .
If the installation has the MaC-Lab ECG in the configuration, the ECG cable shall
not be run through the conduit, it will be used in the Control Room to connect
Mac-Lab and IVUS PCs.