Establish a 76 mm (3") conduit below floor from the IVUS CPU location in the Control Room,
to the foot end area of the Patient Table in the Procedures Room:
Locate the Procedures Room exit of the conduit close to the centerline of the Patient Table
Locate it as close to the Patient Table base as possible, considering :
Room for access to the table for service purposes
Limitation from other cables connected to the table
Location of the table plate
Location of Mac-Lab conduit
Location of Physio or Med Gases connections
The IVUS cables are moving cables, they have to allow the Patient Table motions
(Panning, Lifting and Rotating)
Use similar solutions (i.e. protection against cleaning fluids, etc. ) as it is used for the Mac-Lab
conduit
See also guidance on Typical Layout drawing 4-58f sheets E1 and S2, showing Mac-Lab and
P/M Gas location recommendations.

5.3 Run Interconnection cables through the Conduit

Use the IVUS PIM (#806365003) as reference to the procedures below.
Unpack , and check the completeness of the Preinstallation kit :
1pcs - Custom PIM cable 30 m (98 ft, 5 in) - Volcano ID :806452001
2pcs - CAT5 cable 30 m (98 ft, 5 in) - Volcano ID :803391001
1pcs - Custom Twin axial cable - Volcano ID :806380001
1pcs – Ground Cable, 30 m (98 ft, 5 in) s5i – Volcano ID :806889001
1pcs - IVUS preinstallation Manual - Volcano ID :806365003
Install 806889001 Ground Cable through the Control Booth conduit (see note)
Install the cables through the IVUS conduit from the Control Room end :
806452001 Room - PIM cable, round shaped connector end to the Procedures
803391001 - Ethernet cable (1pcs)
Install the optional cables through the IVUS conduit from the Control Room end :
803391001 - Ethernet cable if 2 IVUS remote control items will be installed 1 IVUS Control
Station and 1 IVUS Joystick)
806380001 - ECG cable in case, if NON Mac-Lab ECG will be installed
NOTE:
NOTE:
NOTE:
160
Innova 2121-IQ/3131-IQ Biplane Cardiovascular Imaging System Pre-Installation Manual
For the ground cable, see the IVUS service manual for special instructions
concerning cable running and cutting .
If the installation has the MaC-Lab ECG in the configuration, the ECG cable shall
not be run through the conduit, it will be used in the Control Room to connect
Mac-Lab and IVUS PCs.
You should consider running the ECG cable through the conduit in case, the
customer requires interconnecting to a NON Mac-Lab ECG at the table base.
In this case you shall hide the unconnected cable in the conduit for future
expansion options.
Direction 5177951-4-1EN, Revision 1
5 IVUS Rev 1 Option