18. If your rack has conductors for grounding or bonding of ungrounded metal parts,
connect the ground cable (not included) to the ground bonding screw. See
Figure 58 on page 71 for the location of the ground bonding screw.
19. You can install an optional REPO circuit that will shut down the entire parallel
system using a single switch. See "Remote Emergency Power-off" on page 113
to install the REPO switch before powering on the parallel system.
20. Connect the parallel input cord from each paralleled UPS as shown in Figure 70:
S
Loosen the two screws on the plug retainer and slide the plug retainer out.
S
Insert the parallel input cord into the socket. The plug is fully seated when the
plug latches snap into place.
S
Slide the plug retainer back in and tighten the screws.
NOTE The plug retainer prevents the plug from being inadvertently unplugged.
S
Gently loop and twist the parallel input cords as shown to minimize stress on
the cords. The loop and twist for each cord may vary depending on
configuration and strain relief to the BladeUPS Bar in the rack.
21. Continue to "Parallel System Initial Startup" on page 90. If you installed the
additional UPS(s) without shutting down the parallel system, perform the steps in
"Parallel System Initial Startup"on the additional UPS(s) only.
Eaton BladeUPS (12 kVA) User's Guide
STANDARD SYSTEM INSTALLATION
S
164201649 Rev 6 www.eaton.com/powerqualtiy
87