10. Install the second supplied blue terminating plug (see Figure 61) into the
CAN OUT port on the last UPS (UPS 3 in Figure 62).
Figure 61. Installing the Blue Terminating Plug (Last UPS)
11. Verify that only the first and last UPSs in the configuration have a blue
terminating plug installed.
12. Using the supplied connectors, install a CAN Bridge Card cable between each
UPS as shown in Figure 62, connecting the CAN OUT port on one UPS to the
CAN IN port on the next UPS.
On startup, the parallel system will identify the UPS wired after UNIT 1 as
UNIT 2, and so forth.
NOTE You can configure the parallel system with UPS 1 at the bottom of the rack (as shown in Figure 62)
or at the top of the rack.
Eaton BladeUPS (12 kVA) User's Guide
STANDARD SYSTEM INSTALLATION
Blue Terminating Plug (CAN OUT)
S
164201649 Rev 6 www.eaton.com/powerqualtiy
75

Advertisement

Table of Contents
loading

Table of Contents