Eaton Powerware BladeUPS User Manual page 45

12 kva
Hide thumbs Also See for Powerware BladeUPS:
Table of Contents

Advertisement

The EBM is heavy (see page 130). Moving the EBM requires a minimum of two people.
7.
Place the EBM on a flat, stable surface with the front of the EBM facing toward
you.
8.
If the mounting brackets are not already installed, align the two mounting
brackets with the screw holes on the side of the EBM and secure with the
supplied 6-32 flat-head screws (see Figure 23).
9.
Attach the EBM front cover:
Align the pins on the rear of the front cover with the openings in the EBM. Push
the cover firmly into place. See Figure 23.
6-32 Flat-Head
Screws
Mounting
Bracket
Figure 23. Installing the EBM Mounting Brackets
10. Slide the EBM into the rack.
11. Secure the front of the EBM to the rack using two hex-head screws in each
mounting bracket as shown in Figure 24.
Figure 24. Securing the EBM Mounting Brackets
Eaton BladeUPS (12 kVA) User's Guide
PREASSEMBLED SYSTEM INSTALLATION
C A U T I O N
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Hex-Head
Screws
37

Advertisement

Table of Contents
loading

Table of Contents