Eaton Powerware BladeUPS User Manual page 63

12 kva
Hide thumbs Also See for Powerware BladeUPS:
Table of Contents

Advertisement

4.
Using two clip nuts and two hex-head screws, attach the rail to the rear of the
rack (see Figure 38 and Figure 39).
The bottom rail uses positions 2 and 4 for the rear hex-head screws. If you are
installing additional rails, place the next rail 7 holes above the last installed screw.
Figure 38. Rear Rail Screw Positions for the EBM
5.
Repeat Steps 3 and 4 for the other rail.
6.
Tighten the assembly wing nuts on both rail assemblies.
The EBM is heavy (see page 130). Moving the EBM requires a minimum of two people.
7.
Place the EBM on a flat, stable surface with the front of the EBM facing toward
you.
Eaton BladeUPS (12 kVA) User's Guide
STANDARD SYSTEM INSTALLATION
Position 13
Position 11
Position 4
Position 2
Clip Nuts
Figure 39. Securing the Rear Rail
C A U T I O N
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Second Rail
First Rail
55