Eaton Powerware BladeUPS User Manual page 44

12 kva
Hide thumbs Also See for Powerware BladeUPS:
Table of Contents

Advertisement

PREASSEMBLED SYSTEM INSTALLATION
36
Eaton BladeUPS (12 kVA) User's Guide
3.
Secure the rail to the front of the rack with two hex-head screws (see Figure 21).
4.
Using two clip nuts and two hex-head screws, attach the rail to the rear of the
rack (see Figure 20 on page 35 and Figure 22).
The bottom rail uses positions 38 and 40 for the rear hex-head screws. If you are
installing additional rails, place the next rail 7 holes above the last installed screw.
5.
Repeat Steps 3 and 4 for the other rail.
6.
Tighten the assembly wing nuts on both rail assemblies.
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Figure 21. Securing the Front Rail
Clip Nuts
Figure 22. Securing the Rear Rail

Advertisement

Table of Contents
loading

Table of Contents