Ebm Setup; Checking The Ebm Accessories - Eaton Powerware BladeUPS User Manual

12 kva
Hide thumbs Also See for Powerware BladeUPS:
Table of Contents

Advertisement

EBM Setup

The BladeUPS EBM comes with all hardware required for installation in a standard
EIA or JIS seismic rack-mount configuration with square and round mounting holes.
The rail assemblies adjust to mount in 48-cm (19-inch) racks with front to rear rail
distances from 61 to 76 cm (24 to 30 inches) deep.

Checking the EBM Accessories

Verify that the following items are included with the EBM:
S
EBM front cover
S
Mounting brackets and fasteners (if not already installed):
- (2) mounting brackets
- (4) 6-32 flat-head screws
S
Rails and fasteners:
- (2) sliding rail assemblies (left and right)
- (2) rear hold-down brackets
- (12) hex-head screws
- (4) U-shaped 10-32 clip nuts
S
EBM user's guide
NOTE Discard the EBM user's guide. Use this user's guide to install the EBM.
Eaton BladeUPS (12 kVA) User's Guide
PREASSEMBLED SYSTEM INSTALLATION
S
164201649 Rev 6 www.eaton.com/powerqualtiy
33

Advertisement

Table of Contents
loading

Table of Contents