Rack Setup For The Ups - Eaton Powerware BladeUPS User Manual

12 kva
Hide thumbs Also See for Powerware BladeUPS:
Table of Contents

Advertisement

Rack Setup for the UPS

The UPS is heavy (see page 130). Removing the UPS from its carton requires a minimum of two people. Use
the corrugated lifting sling (packaged with the UPS) to move the UPS.
NOTE Mounting rails are required for each individual cabinet.
To install the UPS rail kit:
1.
Select the proper holes in the rack for positioning the UPS in the rack (see
Figure 43).
NOTE The UPS takes up position 1 through position 12.
NOTE Verify that the hole patterns on the rails and mounting brackets align with the hole pattern on the
rack.
Bottom of Rack
or Top of Other
Cabinet
Figure 43. Front Rail Screw Positions for the UPS
Eaton BladeUPS (12 kVA) User's Guide
STANDARD SYSTEM INSTALLATION
C A U T I O N
Position 12
Position 9
Position 4
Position 1
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Top of Rail
Mounting
Bracket
Bottom of Rail
59

Advertisement

Table of Contents
loading

Table of Contents