STANDARD SYSTEM INSTALLATION
86
Eaton BladeUPS (12 kVA) User's Guide
Standalone/
Parallel
(remove)
For Parallel
Use Only
Redundant Signal Cable
Standalone/
Parallel
For Parallel
Use Only
Standalone/
Parallel
Figure 69. Typical CAN Bridge Card and Redundant Signal Wiring
15. Tighten the screws securing each newly installed Powerware Hot Sync CAN
Bridge Card in its X-Slot communication bay.
16. If you are installing power management software, connect your computer to the
UPS communication port or optional X-Slot card (see page 107). For the
communication port, use the supplied serial cable.
NOTE You may install one ConnectUPS-X Web/SNMP Card per UPS, or one card per parallel system.
Installing one card per UPS provides communication with each UPS. Installing one card per parallel system
provides detection of a problem with at least one UPS, but does not specify which UPS or how many.
17. If you left the UPSs unattached to the rack, secure the front and rear of each
UPS as described in Steps 14 and 15 on page 63.
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Blue Terminating Plug
CAN Bridge Card Cable
Blue Terminating Plug
UPS 3
CAN
CAN
IN
OUT
UPS 2
UPS 1