Eaton Powerware BladeUPS User Manual page 88

12 kva
Hide thumbs Also See for Powerware BladeUPS:
Table of Contents

Advertisement

STANDARD SYSTEM INSTALLATION
Figure 65. Installing the Blue Terminating Plug (Single Parallel-Ready UPS Installation)
80
Eaton BladeUPS (12 kVA) User's Guide
Blue Terminating Plug (CAN IN)
9.
Tighten the screws securing the Powerware Hot Sync CAN Bridge Card in its
X-Slot communication bay.
10. If you are installing power management software, connect your computer to the
UPS communication port or optional X-Slot card (see page 107). For the
communication port, use the supplied serial cable.
NOTE You can install one ConnectUPS-X Web/SNMP Card per UPS, or one card per parallel system.
Installing one card per UPS provides communication with each UPS. Installing one card per parallel system
provides detection of a problem with at least one UPS, but does not specify which UPS or how many.
11. If you left the UPS unattached to the rack, secure the front and rear of the UPS
as described in Steps 14 and 15 on page 63.
12. If your rack has conductors for grounding or bonding of ungrounded metal parts,
connect the ground cable (not included) to the ground bonding screw. See
Figure 58 on page 71 for the location of the ground bonding screw.
13. You can install an optional REPO circuit that will shut down the entire
parallel-ready system using a single switch. See "Remote Emergency
Power-off" on page 113 to install the REPO switch before powering on the
parallel-ready system.
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Blue Terminating Plug (CAN OUT)

Advertisement

Table of Contents
loading

Table of Contents