Siemens SIMOTION D4 5-2 Series Commissioning And Hardware Installation Manual page 356

Hide thumbs Also See for SIMOTION D4 5-2 Series:
Table of Contents

Advertisement

Diagnostics
8.1 Diagnostics via LED displays
LED displays for PROFINET
Table 8- 3
Meaning of the LED displays for the D4x5-2 DP/PN and CBE30-2
Name
Color
LINK
Green
ACT
Yellow
D4x5-2:
Red
PN
CBE30-2:
FAULT
D4x5-2:
Green
SY/MT
1)
CBE30-2:
SYNC
1)
If no IRT has been configured, then generally no synchronization will be made to the send cycle clock. LED is off.
1)
356
State
Meaning
On
A different device is connected to port x and a physical connection exists.
Flashing
Data is being received or sent at port x.
Off
PROFINET interface is operating without error; the data exchange to all
configured I/O devices is running.
On
PROFINET interface bus fault
No physical connection to a subnet/switch.
Incorrect transmission rate
Full duplex transmission is not activated
Flashing (2 Hz)
Failure of a connected I/O device
At least one of the assigned I/O devices cannot be addressed.
Incorrect or no configuration.
Off
The PROFINET interface has not synchronized yet to the send cycle clock
of PROFINET IO with IRT, or PROFINET IO with IRT has not been
configured (e.g. only PROFINET IO with RT or TCP/IP communication).
If IRT has been configured for SIMOTION, the PROFINET interface
generates a local substitute cycle clock as long as there is no
synchronization to the send cycle clock of PROFINET IO with IRT:
SIMOTION task system has synchronized to the local substitute cycle
clock of the PROFINET interface. SINAMICS Integrated and external
isochronous DP interfaces are synchronized to the local substitute cycle
clock of the PROFINET interface.
On
The PROFINET interface has synchronized to the send cycle clock of
PROFINET IO with IRT.
If IRT data has been configured for SIMOTION, then the following applies:
The task system of SIMOTION has synchronized to the send cycle clock of
PROFINET IO with IRT.
SINAMICS Integrated and external isochronous DP interfaces are
synchronized to the send cycle clock of PROFINET IO with IRT.
Flashing (2 Hz)
The PROFINET interface has synchronized to the send cycle clock of
PROFINET IO with IRT.
If IRT data has been configured for SIMOTION, then the following applies:
The task system of SIMOTION has synchronized to the send cycle clock of
PROFINET IO with IRT.
SINAMICS Integrated and external isochronous DP interfaces are not yet
synchronized to the send cycle clock of PROFINET IO with IRT.
Commissioning and Hardware Installation Manual, 02/2012