Examples of upgrade scenarios are listed in the following overview table. They are shown in
the columns. The lines list the principle measures that have to be performed. Whether the
measure has to be performed in a specific case, must be decided project-specifically.
Grayed-out cells mean that a measure is not required.
Note
If the version is changed and the SIMOTION controller replaced at the same time, then all
measures apply; the measures must be performed in the TOP-DOWN sequence according
to the table.
SIMOTION D4x5-2
Commissioning and Hardware Installation Manual, 02/2012
Service and maintenance
7.1 Overview