Nortel Meridian SL-100 SE Replacement page 29

Commercial systems card replacement procedures
Table of Contents

Advertisement

32
33
Meridian SL-100 SE Commercial Systems Card Replacement Procedures MSL15
If the LOADPM command
failed, and the reason is different
from the first time LOADPM failed
failed, and the reason is the same
as the first time LOADPM failed
failed, and you have not replaced
all the cards listed in step 17
failed, and you have replaced all
the cards listed in step 17
Load the PM unit by typing
>LOADPM
UNIT
and pressing the Enter key.
where
unit_no
is the number of the unit (0 or 1) to be loaded
If the LOADPM command
passed
failed, and the reason is different
from the first time LOADPM failed
failed, and the reason is the same
as the first time LOADPM failed
failed, and you have not replaced
all the cards listed in step 17
failed, and you have replaced all
the cards listed in step 17
Replace the next card on the card list.
a Perform the appropriate procedure in Card Replacement
Procedures.
b Return to step 32 in this procedure.
XPM card replacement procedures 29
in a DTCI shelf
Do
step 16
step 37
step 33
step 37
unit_no
Do
step 34
step 16
step 37
step 33
step 37
NTAX78AA
(continued)

Advertisement

Table of Contents
loading

Table of Contents