Ricoh Aficio Color 3006 Service Manual page 182

Table of Contents

Advertisement

COPIER INSTALLATION
[A]
A259R303.WMF
[B]
3. Remove the developer cover [A] (2 screws).
4. Place the development unit [B] in the developer installation position [C] and
pour in 1 bag (380 g) of developer [D].
NOTE: Pour developer into the auger from the development roller side. This
speeds the agitation of the developer and prepares it for use more
quickly.
5. Place the development unit in the developer scoop-up position [E], rotate the
sleeve in the forward direction [F] to scoop up developer, then check that the
roller is evenly coated with developer from front to rear.
[D]
[C]
A259R306.WMF
3-14
24 February, 1999
[F]
[E]
A259R309.WMF

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aficio color 4006Aficio color 4106

Table of Contents