Reinstalling A Cfpc; Figure 38: Reinstalling An Fpc After Installing The M120 Router - Juniper Networks Hardware Manual

Multiservice edge router
Table of Contents

Advertisement

Reinstalling a CFPC

Copyright © 2010, Juniper Networks, Inc.
All manuals and user guides at all-guides.com
Grasp both ejector handles and rotate them simultaneously clockwise until the FPC
6.
is fully seated.
Repeat the procedure to reinstall each remaining FPC.
7.

Figure 38: Reinstalling an FPC After Installing the M120 Router

To reinstall a CFPC (see Figure 39 on page 76):
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to an approved site ESD grounding point. See the instructions for your site.
Identify the slot in which the CFPC will be installed.
2.
Verify that the transceiver has a rubber safety cap covering the PIC transceiver. If it
3.
does not, cover the transceiver with a safety cap.
Ensure that the CFPC is right-side up, with the text on the faceplate of the CFPC facing
4.
upward.
Lift the CFPC into place and carefully align first the bottom, then the top of the CFPC
5.
with the guides inside the card cage.
Slide the CFPC all the way into the card cage until you feel resistance.
6.
Pull the end of the ejector lever away from the CFPC faceplate, and hold the lever out
7.
while continuing to push on the CFPC faceplate to further install it into the chassis.
Chapter 7: Installing the M120 Router Without a Mechanical Lift
75