Reinstalling Fpcs; Figure 37: Reinstalling A Power Supply After Installing The M120 Router - Juniper Networks Hardware Manual

Multiservice edge router
Table of Contents

Advertisement

M120 Multiservice Edge Router Hardware Guide

Reinstalling FPCs

74
All manuals and user guides at all-guides.com

Figure 37: Reinstalling a Power Supply After Installing the M120 Router

To reinstall an FPC (see Figure 38 on page 75):
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to an approved site ESD grounding point. See the instructions for your site.
Using the list you created when you removed the FPCs, locate the slot in the FPC card
2.
cage in which you plan to install the FPC.
Ensure that the FPC is right-side up, with the text on the faceplate of the FPC facing
3.
upward.
Lift the FPC into place and carefully align first the bottom, then the top of the FPC
4.
with the guides inside the card cage.
CAUTION: When the FPC is out of the chassis, do not hold it by the ejector
handles, bus bars, or edge connectors. They cannot support its weight.
Slide the FPC all the way into the card cage until you feel resistance.
5.
Copyright © 2010, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents