9
Maintenance and Repair
Exchange the Rotor Seal
9
Reconnect the capillaries and tubes to the valve ports.
The correct plumbing is shown below and on the safety
cover of the module.
210
10
Slide the waste tube into the waste holder in the leak
tray.
Agilent InfinityLab LC Series Vialsamplers User Manual