Scheduler
Figure 176: Adding a New Event
2. Define the start and, if applicable, the end of the event.
●
●
I
3. Enter a brief description of the event in the Description box. (This description will
display on the schedule view.)
4. Specify options specific to the type of event. See the following sections:
●
●
●
●
●
5. (Optional) Specify when and how often the event reoccurs (see
a Scheduled Event" on page
280
Specify the Start Date and Start Time using the pop-up calendar and drop-down
box.
(Replication throttle events only) Specify the End Date and End Time. The end
date and time must occur after the start date and time.
For a new event, you can click and drag to adjust the start and end time. For an
existing event, you can drag the event to change when it occurs. You can also
drag the left or right edge of the event to adjust the start or end time.
"Scheduling a Share or Partition for Replication" on page 281
"Scheduling Replication Throttling" on page 282
"Scheduling E-mail Reports" on page 283
"Scheduling Healthchecks" on page 284
"Scheduling Space Reclamation" on page 284
285).
Configuration
"Setting Recurrence for
U41840-J-Z125-7-76