Fujitsu ETERNUS CS800 S5 User Manual page 293

File
Table of Contents

Advertisement

Configuration
Show or hide all shares or partitions
Filter shares or partitions
Figure 175: Scheduler Toolbar
Adding or Editing a Scheduled Event
To add or edit a scheduled event:
1. On the Scheduler page, adjust the schedule view to display the time period when the
event will occur (see
following actions (see
I
U41840-J-Z125-7-76
Go to a specified day
"Viewing Scheduled Events" on page
Figure
To add a new event, click and drag on the schedule in the row for the type of event
to add. A new event is added where you dragged the cursor.
To schedule replication for NAS shares or VTL partitions, click the arrow next to the
folder to display all shares or partitions. Then click and drag in the row for the share
or partition to schedule.
I
The new event must begin after the current time, which is indicated by the
dotted vertical line.
To edit an existing event, double-click the event. If the event is recurring, select
Open this occurrence to edit only the one instance of the event, or select Open
the series to edit the entire recurring series, and then click OK.
I
You cannot edit an event that occurred in the past.
You can also right-click an existing event to see options for editing an event.
Refresh the display
Go to today
176):
Scheduler
Select a view
Go back
Go forward
278). Then do one of the
279

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents