3. PERIODIC CHECK
[1]
[3]
[2]
50
[1]
[2]
50gaf2c163na
[2]
[1]
[2]
50gaf2c164na
[1]
50gaf2c113na
Field Service Ver.2.0 Mar. 2009
12.
Remove the C-ring [1] and then remove the feed
roller [2].
13.
Remove the C-rings [1], 1 each, and then remove
the 2 bearings [2].
14.
Remove the pick-up roller assy [3].
15.
Remove the C-ring [1] and then remove the pick-
up roller [2].
16.
Reinstall the above parts following the removal
steps in reverse.