Module Or An Application Module With An Mvme167 Card - Meridian Link/Customer Controlled Routing Installation And Upgrade Manual

Meridian controlled routing installation and upgrade guide
Table of Contents

Advertisement

Chapter 14: Software installation, upgrade, and update procedures 429
Procedure 6: Load the operating system tape on an IPE

Module or an Application Module with an MVME167 card

If you have just installed a new MVME167 card in an Application Module
and you are installing the software for the first time, you need to do steps
2Ð6. Otherwise, skip these five steps.
Note: If you intend to activate CCR and use terminals or printers,
ensure that the MVME332XT or MVME332XTS card is installed
before you start this procedure.
This procedure assumes that you have backed up all files and have powered
down the IPE Module or the Application Module (Procedure 4).
1
Turn on the power. If the Ò167-Diag>Ó or the Ò167-Bug>Ó prompt
appears, go to step 5. If the Ò4120-Diag>Ó or the Ò4120-Bug>Ó prompt
appears, go to step 4. If the following messages appear on the
console, go to step 2.
Figure 172
System restart messages (IPE Module or MVME167 card)
Copyright Motorola Inc. 1988 - 1992, All Rights Reserved
VME167 Debugger/Diagnostics Release Version 1.4 - 07/22/92
COLD Start
Local Memory Found = 00800000 (&8388608)
MPU Clock Speed = 25Mhz
2
Type h as soon as messages start to appear. If you are too late,
press either the [F5] or the [Break] key.
The start-up interrupt menu appears.
3
If you are using an IPE Module, go to step 4.
If you are using a new MVME167 card, go to step 5.
If you are using a previously configured MVME167 card, go to
step 7.
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian link

Table of Contents