Receiving The Ipe Module And Application Module Components - Meridian Link/Customer Controlled Routing Installation And Upgrade Manual

Meridian controlled routing installation and upgrade guide
Table of Contents

Advertisement

116
Chapter 7: Unpack and inspect hardware
Receiving the IPE Module and Application Module
components
553-3202-210 Standard October 1998
¥
Store circuit packs in a clean, dry area.
¥
When tape cartridges have been subjected to temperature extremes,
allow them to stabilize to room temperature before unpacking. This
prevents the accumulation of condensation on the tapes.
CAUTION
Risk of equipment damage
!
Wear an antistatic wrist strap when handling
components. As an additional safety measure, handle
components by their edges and, whenever possible, with
the loosened packing material still around them.
Use the following procedure to check all items received against the order
form and shipper attached to each carton.
1
Remove each item from the carton.
2
Compare each itemÕs part number against the part number listed on
the shipper.
3
Verify that the shipped quantity and the quantity received match.
4
Verify that the order quantity on the shipper matches the shipped
quantity.
5
Report all discrepancies to your Nortel support personnel. Use the
NTI number in the top right corner of the shipper as a reference.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian link

Table of Contents