Meridian Link/Customer Controlled Routing Installation And Upgrade Manual page 229

Meridian controlled routing installation and upgrade guide
Table of Contents

Advertisement

Figure 56
IPE shelf I/O panels (Options 21Ð81)
L
J4
S
R
U
J5
Left I/O panel
Use the following procedure to cable to external equipment.
K
N
M
T
1
Ensure that the power for the IPE Module is turned off.
2
Connect the NT1R03AA and NT1R03BA octopus cables to the I/O
panel; the specific connectors depend on the location of the IPE
Module. Tables 70 and 71 list the connectors to use for various
locations of the IPE Module. For example, if the IPE Module is in
slots 0 through 3, connect the NT1R03AA cable to connector D, and
the NT1R03BA cable to connector A.
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Chapter 9: Meridian Link/CCR interface cabling 211
B
A
J2
F
E
D
C
J3
H
G
Right I/O panel

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Meridian Link/Customer Controlled Routing

This manual is also suitable for:

Meridian link

Table of Contents