Cabling The Application Module To External Equipment - Meridian Link/Customer Controlled Routing Installation And Upgrade Manual

Meridian controlled routing installation and upgrade guide
Table of Contents

Advertisement

Cabling the Application Module to external equipment

The following procedure to cable the Application Module to external
equipment is only one of a series of procedures to install an Application
Module. The series is shown in Table 12 in Chapter 5, ÒHardware
installation overview.Ó Ensure that you have completed steps 1 through 6 in
Table 12 before you start the following procedure.
Complete the Application Module hardware installation by connecting the
external cables. Figures 59 and 60 show the I/O subpanel connectors.
Figures 61 and 62 show the universal I/O panel connectors. Figures 63 and
64 show generic I/O panel connectors. Figures 65Ð74 show the cabling.
Refer to the ÒApplication Module cablingÓ section for more information on
cabling.
1
If you are using an MVME712M or MVME712A transition card, go to
step 2. To connect the built-in modem on the MVME712AM
transition card, connect an NT7D71BA cable from the Application
Module connection
¥
J9 on the I/O subpanel
¥
INT MODEM on the universal I/O panel
¥
card 1 conn 4 on the generic I/O panel
to the building wiring and terminate at the MDF. For more
information, refer to ÒInternal modem cabling (MVME712AM card
only)Ó in this chapter.
If the modem connection is through the Meridian 1, connect to a
500/2500 line card. If the modem is not to be connected through the
Meridian 1, connect to a central office (CO) line.
Note: This connection is required for technical support for your
system.
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Chapter 9: Meridian Link/CCR interface cabling 227

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian link

Table of Contents