Figure 4-4. Conduit And Wire Entry Locations - Eaton Power Xpert Plus 1 Installation And Operation Manual

450–550 kva
Table of Contents

Advertisement

UPS SYSTEM INSTALLATION
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
BOTTOM VIEW
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
t
4-8
Power Xpert
9395 UPS (450–550 kVA) Installation and Operation Manual
4.
Locate the external wiring terminal hardware kit packed on the bottom left side
of the ISBM section.
5.
If installing a UPS with separate rectifier feeds, proceed to Step 6; otherwise,
proceed to Step 8.
NOTE On a UPS that is configured for separate rectifier inputs, all sources that feed the separate rectifier
inputs must be derived from a common ground point.
6.
Connect phase A, B, and C rectifier input power wiring from the utility source to
each UPM rectifier input terminal block in the UPS cabinet. See paragraph 3.2.2
on page 3-7, Table 3‐6 on page 3-11, and Table 3‐11 on page 3-13 for wiring and
termination requirements.
Ventilation Grill Debris Shield
(Remove shield before operating system.)
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Figure 4‐4. Conduit and Wire Entry Locations
Front
Front
S
www.eaton.com/powerquality
164201701 Rev 4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power xpert 9395

Table of Contents