Front Frame/Right Frame - Epson WorkForce 600 Service Manual

Hide thumbs Also See for WorkForce 600:
Table of Contents

Advertisement

EPSON WorkForce 600/EPSON Stylus OFFICE TX600FW/BX600FW/EPSON Stylus SX600FW/ME OFFICE 700FW
When installing the Left Frame, take care of the following.
Make sure to route the PF Encoder FFC through the hole of
the Left Frame, and secure it with a double-sided tape as
shown in
Figure.
Make sure to match the dowels of the Base Frame and the
positioning holes of the Left Frame as shown in
When installing the Left Frame, tighten the screws in the order
given in
Figure.
4-58.
DISASSEMBLY/ASSEMBLY
4-58.
Figure.
Disassembling the Printer Mechanism

4.5.6 Front Frame/Right Frame

Parts/Components need to be removed in advance
Scanner Unit/ADF Unit/Upper Housing /Hinge/Middle Cover/Printer Mechanism/
Card Slot Cover/Main Board Unit/Left Frame
4-58.
Removal procedure
1.
Remove the acetate tape (x2) that secures the Head FFC to the Front Frame.
2.
Peel off the ferrite core that secures the Head FFC to the Front Frame.
3.
Release the Head FFC from the hooks (x3) of the Front Frame.
4.
Remove the Grounding Spring from the Front Frame.
Acetate tape
Figure 4-59. Removing the Front Frame/Right Frame (1)
Ferrite core
Head FFC
Front Frame
Grounding Spring
Revision A
Hook
Double-sided tape
116
Confidential

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents