Epson WorkForce 600 Service Manual page 116

Hide thumbs Also See for WorkForce 600:
Table of Contents

Advertisement

EPSON WorkForce 600/EPSON Stylus OFFICE TX600FW/BX600FW/EPSON Stylus SX600FW/ME OFFICE 700FW
5.
Peel off the Porous Pad Frame Right from the Right Frame and the Base
Frame.
Porous Pad Frame Right
Right Frame
Base Frame
Figure 4-60. Removing the Front Frame/Right Frame (2)
6.
Remove the screw (x1) that secures the Front Frame and the Right Frame
together.
7.
Release the dowel (x1) and the hook (x1) that secure the Right Frame, and
remove the Right Frame.
Hook
dowel
Figure 4-61. Removing the Front Frame/Right Frame (3)
DISASSEMBLY/ASSEMBLY
Dowel and hole
Double-sided tape
Right Frame
Front Frame
C.B.P. 3x6, F/Zn-3C (6±1kgfcm)
Disassembling the Printer Mechanism
8.
Release the hook (x1), and remove the Front Frame.
Hook
Cutout
Figure 4-62. Removing the Front Frame/Right Frame (4)
Align the ferrite core with the line mark shown in
then secure it to the Front Frame with double-sided tape.
After replacing the Front Frame, be sure to attach acetate tape
as shown in the figure below.
13mm
18mm
Line mark
Figure 4-63. Standard of acetate tape attachment
Before securing the Porous Pad Frame Right, align the hole of
the Porous Pad Frame Right with the dowel of the Right Frame
as shown in
Figure.
4-60.
Revision A
Front Frame
Figure.
4-63,
Ferrite core
117
Confidential

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents