Alcatel-Lucent OmniSwitch 6450 Management Manual page 149

Hide thumbs Also See for OmniSwitch 6450:
Table of Contents

Advertisement

Managing CMM Directory Content
Note. If the switch is rebooted before using the copy certified working command, the switch runs from
the certified directory as the working and certified directories are not the same. This behavior is described
in
"Where is the Switch Running From?" on page
To reboot the switch from the working directory, enter the following command at the prompt, along with a
timeout period (in minutes), as shown:
-> reload working rollback-timeout 5
At the end of the timeout period, the switch reboots again normally, as if a reload command had been
issued.
Note. It is important to certify the working directory and synchronize the stack as soon as the validity of
the software is established. Stacks booted from the working directory or unsynchronized stacks are at risk
of mismanaging data traffic due to incompatibilities in different versions of switch software. Certifying
the working directory is described in
page
5-21, while synchronizing the switch is described in
CMMs" on page
5-27.
Rebooting the Switch from the Working Directory with No Rollback Timeout
It is possible to reboot from the working directory without setting a rollback timeout, in the following
manner:
-> reload working no rollback-timeout
Scheduling a Working Directory Reboot
It is possible to cause a working directory reboot of the CMM at a future time by setting time parameters
in conjunction with the
rollback time-out time, or that there is no rollback.
To schedule a working directory reboot of the CMM in 3 hr and 3 min with no rollback time-out, you
would enter:
-> reload working no rollback-timeout in 3:03
To schedule a working directory reboot of the CMM at 8:00pm with a rollback time-out of 10 minutes,
you would enter:
-> reload working rollback-timeout 10 at 20:00
Note. Scheduled reboot times should be entered in military format ( a twenty-four hour clock).
OmniSwitch 6250/6450 Switch Management Guide
"Copying the Working Directory to the Certified Directory" on
reload working
command, using the in or at keywords. You still need to specify a
Managing the Directory Structure (Non-Redundant)
5-4.
"Synchronizing the Primary and Secondary
June 2013
page 5-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Omniswitch 6350Omniswitch 6250

Table of Contents