Do not lift the disk shelf by the handles on the power supply with fan modules; they are not
designed to take the weight.

Prerequisites

Refer to the following section for an overview of your disk shelf.
Disk Shelf Overview

Tools and Equipment Needed

To install the shelf, you need the following tools:
Phillips head No. 2 screwdriver that is a minimum of 4 inches long.
A mechanical lift is highly recommended because the chassis can weigh approximately 110
lbs (50 kg). At least three people are required: two to install the shelf and one spotter to
engage the rails.<br />If a mechanical lift is not available, remove the power supply with fan
modules to reduce the weight, see Disk Shelf Maintenance Procedures for instructions.
Use one of the following racks for the disk shelf:
Sun Rack II 1042/1242 cabinet
Any 19-inch wide, 4-post, EIA-compatible rack or cabinet with a front-to-back depth
between vertical cabinet rails of 61 cm to 91 cm (24 in. to 36 in.). The cabinet can have
threaded or unthreaded cabinet rails. Threaded cabinets must be M6 or 10-32 cabinets.
Cabinets must be able to support the weight of all equipment contained within them.
Position the rack where the shelf is to be installed adjacent to the rack where the controller is
installed, if separate. Stabilize the cabinet and lock the casters. To facilitate access, remove doors
from cabinets.

Tasks

DE2 24C Tasks
Installing the Disk Shelf into the Rack Slide Rails
The Oracle Storage Drive Enclosure DE2-24C requires four standard mounting units (4RU) of
1
vertical space in the cabinet. Starting at the bottom of the cabinet, locate the appropriate rack
unit (RU) height. Install disk shelves below controllers to prevent the rack from tipping.
Chapter 2 • Installation