De2 24P; Precautions - Oracle ZFS Installation Manual

Storage appliance
Hide thumbs Also See for ZFS:
Table of Contents

Advertisement

DE2 24P

Powering off or removing all SAS chains from a disk shelf will cause the controller(s) to panic to
prevent data loss, unless the shelf is part of an NSPF (no single point of failure) data pool. To
avoid this, shut down the controller(s) before decommissioning the shelf. For details on NSPF
profiles, see Profile Configuration.
Stop all input and output to and from the disk shelf.
1
Wait approximately two minutes until all disk activity indicators have stopped flashing.
2
Place the power supply on/off switches to the "O" off position.
3
Disconnect the power cords from the external power source for the cabinet.
4
Note: All power cords must be disconnected to completely remove power from the disk shelf.
See Also
Cabling Diagrams
DE2 24P

Precautions

Observe the following cautions when installing the Oracle Storage Drive Enclosure DE2-24P
into a rack using the supplied rail kit. Note that if your rail kit shipped with installation
instructions, use those instructions instead.
Always load equipment into a rack from the bottom up so that it will not become top-heavy
and tip over. Deploy the anti-tip bar to prevent the rack from tipping during equipment
installation.
Ensure that the temperature in the rack does not exceed the controller's maximum ambient
rated temperatures. Consider the total airflow requirements of all equipment installed in the
rack to ensure that the equipment is operated within its specified temperature range.
Do not remove a component if you do not have an immediate replacement. The disk shelf
must not be operated without all components in place.
Do not lift the disk shelf by the handles on the power supply with fan modules; they are not
designed to take the weight.
126
Oracle ZFS Storage Appliance Installation Guide • January 2014 E48491–02

Advertisement

Table of Contents
loading

Table of Contents