Powering On The Switch - H3C S12508-AC Installation Manual

H3c s12500 routing switch series installation guide
Hide thumbs Also See for S12508-AC:
Table of Contents

Advertisement

Figure 45 Set the terminal emulation in Test Properties dialog box

Powering on the switch

Verification before power-on
Before powering on the switch, verify that:
The interface cables, power cables, and the grounding cable are correctly connected.
The input power voltage meets the requirement of the switch.
The console cable is properly connected, the terminal or PC used for configuration has started, and
the configuration parameters have been set.
CAUTION:
Before powering on the switch, identify the power switch in the equipment room so that you can disconnect
the power supply promptly in case of an emergency.
Powering on the switch
To power on the switch:
Turn on the power switch of the power source providing power to the switch.
1.
Turn on the power switch on the switch.
2.
Before the switch is powered on, the basic manufacturing information about the switch is displayed:
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S12518-dcS12508-dcS12518-ac

Table of Contents