Sign In
Upload
Manuals
Brands
H3C Manuals
Switch
S9820-8C
H3C S9820-8C Manuals
Manuals and User Guides for H3C S9820-8C. We have
3
H3C S9820-8C manuals available for free PDF download: Installation Manual
H3C S9820-8C Installation Manual (49 pages)
Brand:
H3C
| Category:
Switch
| Size: 7 MB
Table of Contents
Table of Contents
6
Preparing for Installation
8
Safety Recommendations
8
Examining the Installation Site
8
Temperature/Humidity
8
Cleanliness
9
Emi
9
Laser Safety
10
Installation Tools
10
Installation Accessories
10
Installing the Switch
12
Installing the Switch in a 19-Inch Rack
13
Rack-Mounting Procedure at a Glance
13
Rack Requirements
13
Installation Accessories
14
Attaching the Mounting Brackets to the Chassis
15
Attaching Cage Nuts and Bottom Support Rails to the Rack
16
Mounting the Switch in the Rack
17
Attaching the Cable Management Frame to the Rack
17
Connecting the Grounding Cable to the Chassis
18
Grounding the Switch
19
Installing/Removing Fan Trays
20
Installing a Fan Tray
20
Removing a Fan Tray
21
Installing and Removing Power Modules
22
Installing a Power Module
22
Removing a Power Module
23
Connecting the Power Cord for a Power Module
24
Installing and Removing Interface Modules
25
Installing an Interface Module
25
Removing an Interface Module
27
Verifying the Installation
27
Accessing the Switch for the First Time
28
Connecting the Serial Console Cable
28
Connecting a Mini USB Console Cable
29
Setting Terminal Parameters
31
Powering on the Switch
31
Maintenance and Troubleshooting
33
Power Module Failure
33
Symptom
33
Solution
33
Fan Tray Failure
33
Configuration Terminal Display Issues
33
No Output
33
Garbled Output
34
Appendix A Chassis Views and Technical Specifications
35
Chassis Views
35
Technical Specifications
36
Appendix B Frus
39
Power Modules
39
Fan Trays
39
Interface Modules
40
Appendix C Ports and Leds
41
Ports
41
Console Port
41
Management Ethernet Port
41
USB Port
43
QSFP28 Port
43
QSFP-DD Port
45
Leds
45
System Status LED
45
QSFP28 Port LED
46
QSFP-DD Port LED
46
Management Ethernet Port Leds
46
Power Module Alarm LED
47
Fan Tray Alarm LED
47
Appendix D Cooling System
47
Appendix E Cable Routing Recommendations
49
Advertisement
H3C S9820-8C Installation Manual (44 pages)
Brand:
H3C
| Category:
Switch
| Size: 6 MB
Table of Contents
Table of Contents
6
Preparing for Installation
8
Safety Recommendations
8
Examining the Installation Site
8
Temperature/Humidity
9
Cleanliness
9
Corrosive Gas Limit
9
Emi
10
Laser Safety
11
Installation Tools
11
Installation Accessories
11
Installing the Switch
13
Installing the Switch in a 19-Inch Rack
14
Rack-Mounting Procedure at a Glance
14
Rack Requirements
15
Installation Accessories
15
Attaching the Mounting Brackets to the Chassis
17
Attaching Cage Nuts and Bottom Support Rails to the Rack
17
Mounting the Switch in the Rack
19
Attaching the Cable Management Frame to the Rack
20
Connecting the Grounding Cable to the Chassis
21
Grounding the Switch
22
Installing/Removing Fan Modules
23
Installing a Fan Module
24
Removing a Fan Module
25
Installing and Removing Power Supplies
25
Safety Guidelines
26
Installing a Power Supply
26
Removing a Power Supply
27
Connecting the Power Cord for a Power Supply
28
Installing and Removing Interface Modules
29
Installing an Interface Module
29
Removing an Interface Module
31
Verifying the Installation
31
Accessing the Switch for the First Time
32
Connecting the Switch to a Configuration Terminal
32
Connecting the Console Cable
33
Connecting a DB9-To-RJ45 Console Cable
33
Connecting a USB-To-RJ45 Console Cable
34
Connecting a Mini USB Console Cable
36
Setting Terminal Parameters
36
Powering on the Switch
36
Setting up an M-LAG System
38
M-LAG System Setup Flowchart
38
Planning for Setting up an M-LAG System
39
Determining Device Installation Locations
39
Reserving Physical Ports for M-LAG Connection
39
Planning the Cable Connection Scheme
40
Configuring the M-LAG System Settings
41
Restrictions and Guidelines
42
Connecting the M-LAG Member Switches
42
Verifying the Configuration
42
Maintenance and Troubleshooting
43
Power Supply Failure
43
H3C S9820-8C Installation Manual (35 pages)
Brand:
H3C
| Category:
Switch
| Size: 5 MB
Table of Contents
Table of Contents
6
Preparing for Installation
7
Safety Recommendations
7
Examining the Installation Site
7
Temperature/Humidity
7
Cleanliness
8
Corrosive Gas Limit
8
Emi
9
Laser Safety
9
Installation Tools
10
Installation Accessories
10
Installing the Switch
12
Installing the Switch in a 19-Inch Rack
13
Rack-Mounting Procedure at a Glance
13
Rack Requirements
13
Installation Accessories
14
Attaching the Mounting Brackets to the Chassis
15
Attaching Cage Nuts and Bottom Support Rails to the Rack
16
Mounting the Switch in the Rack
17
Attaching the Cable Management Frame to the Rack
17
Connecting the Grounding Cable to the Chassis
18
Grounding the Switch
19
Installing/Removing Fan Trays
20
Installing a Fan Tray
20
Removing a Fan Tray
21
Installing and Removing Power Modules
22
Installing a Power Module
22
Removing a Power Module
23
Connecting the Power Cord for a Power Module
24
Installing and Removing Interface Modules
25
Installing an Interface Module
25
Removing an Interface Module
27
Verifying the Installation
27
Accessing the Switch for the First Time
28
Connecting the Switch to a Configuration Terminal
28
Connecting the Console Cable
29
Connecting a DB9-To-RJ45 Console Cable
29
Connecting a USB-To-RJ45 Console Cable
30
Connecting a Mini USB Console Cable
32
Setting Terminal Parameters
32
Powering on the Switch
32
Maintenance and Troubleshooting
34
Power Module Failure
34
Symptom
34
Solution
34
Fan Tray Failure
34
Configuration Terminal Display Issues
34
No Output
34
Garbled Output
35
Advertisement
Advertisement
Related Products
H3C S9820-64H
H3C S9820 Series
H3C S9820-8M
H3C S9820-8C-SAN
H3C S9826-32C
H3C S9825 Series
H3C S9825-64D
H3C S9827 Series
H3C S9827-128DH
H3C S9825-128B
H3C Categories
Switch
Network Router
Wireless Access Point
Control Unit
Server
More H3C Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL