Verification After Power-On - H3C S12508-AC Installation Manual

H3c s12500 routing switch series installation guide
Hide thumbs Also See for S12508-AC:
Table of Contents

Advertisement

..........................................................................
..........................................................................
Done!
System is starting...
Starting application at 0x00100000 ...
TLB init OK.
LBC init OK.
LAW init OK.
Bsp init start...
MMU init OK.
CRC init OK.
Frame data init OK.
Connect IRQ 0 OK.
Enable IRQ 0 OK.
Connect IRQ 1 OK.
Enable IRQ 1 OK.
Connect IRQ 2 OK.
Enable IRQ 2 OK.
Connect IRQ 4 OK.
Enable IRQ 4 OK.
Connect IRQ 5 OK.
Enable IRQ 5 OK.
Connect IRQ 6 OK.
After the switch completes booting the applications, the following information appears on the terminal
screen:
Press ENTER to get started.
Press Enter to begin configuring the switch at the prompt:
<H3C>
NOTE:
The S12500 Routing Switch Series provides a command line interface (CLI). For more information about
the CLI, see
The output depends on your switch model.

Verification after power-on

H3C recommends that you check the following conditions after the switch is powered on:
The cooling system is working. You should be able to hear fan rotation noise and feel air being
blown out.
All the system LEDs on the MPUs are functioning normally.
Table 15 LED status when the switch operates normally
Module
MPU
H3C S12500 Routing Switch Series Fundamentals Configuration Guide.
LED
SFC (red and green)
Status
Flashing (green)
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S12518-dcS12508-dcS12518-ac

Table of Contents