H3C S12508-AC Installation Manual page 50

H3c s12500 routing switch series installation guide
Hide thumbs Also See for S12508-AC:
Table of Contents

Advertisement

Figure 34 Remove the protective box
Move the ejector levers of the MPU outwards, hold the MPU by the handle, and push the MPU into
4.
the slot along slide rails slowly.
Push the ejector levers inward to ensure close contact between the MPU and the backplane.
5.
Position the screws into the holes and fasten them with a screwdriver to fix the MPU.
6.
Figure 35 Install an MPU
IMPORTANT:
Fasten the screws of each card right after you insert it.
To avoid damage to a card, do not use excessive force when installing and removing the card.
40

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S12518-dcS12508-dcS12518-ac

Table of Contents