Booting The Switch; Verifying Installation Before Power-Up; Powering Up The Switch - H3C S3610- 28P Installation Manual

Table of Contents

Advertisement

Installation Manual
H3C S3610 Series Ethernet Switches
Step 7: Select File/Properties.
Step 8: In the Properties dialog box, select the Settings tab, as shown in Figure 4-6.
Step 9: Select VT100 or Auto detect in the Emulation dropdown menu.
Step 10: Click <OK>.
Figure 4-6 Settings tab

4.4 Booting the Switch

4.4.1 Verifying Installation before Power-up

Before powering up the switch, check that:
Both the power cord and the grounding wire are correctly connected.
Proper power supply is used.
The console cable is correctly connected.
The console terminal (or PC) has been started and the related parameters have
been set on it.

4.4.2 Powering up the Switch

For the models in the S3610 series, the displayed Boot ROM information is similar.
Following is the Boot ROM information displayed on the S3610-52P:
Chapter 4 Starting up the Switch at the Initial Boot
4-4

Advertisement

Table of Contents
loading

Table of Contents