Replacing Cr Driven Pulley - MUTOH ValueJet 1604 Service Manual

Mutoh valuejet 1604 service manual
Table of Contents

Advertisement

VJ-1604   Maintenance Manual
4.7.6

Replacing CR Driven Pulley

After installing the CR driven pulley, always ensure that the steel belt is evenly guided along the
center part of the CR motor assembly pulley by moving the carriage left and right by hand.
1. Remove the side maintenance cover L.
"4.2.5 Removing Side Maintenance Cover L" p.4-12
2. Remove the side top cover L.
"4.2.7 Removing Side Top Cover L" p.4-14
3. Remove the steel belt adjustment screws (2 pieces).
No.
4. Confirm that the steel belt is loosened.
5. Remove the CR driven pulley.
6. Remove the screw caps (2 pieces).
7. Replace the CR driven pulley assembly.
1
5
3
5
4
1
CR driven pulley
2
Adjustment screws
(pan-head screw with spring washer and flat washer M3
40)
3
Steel belt
4
Return pulley mounting plate
5
Screw cap
Part name
4-99
4 Parts Replacement
2
×
Rev.-05

Advertisement

Table of Contents
loading

Table of Contents