Avaya IP Office Installation Manual page 129

Ip office installation
Hide thumbs Also See for IP Office:
Table of Contents

Advertisement

Parts and Equipment Required
External Expansion Module.
Each module is supplied with a suitable external power supply unit and a RJ45-RJ45 expansion interconnect cable.
Power cord for the power supply
Rack mounting kit
Cable labeling tags.
Procedure
1. Switch off power to the IP Office control unit.
2. Attach the external expansion module's power supply.
3. Connect the blue expansion interconnect cable from the module's EXPANSION port to the first free EXPANSION
port on the control unit.
4. Make careful note of the port used and include this detail on the cable label and any other system records.
5. Switch on power to the module. Wait for the center LED on the front of the module to change from red to green.
6. Switch on power to the control unit.
7. Once the control unit has rebooted, using Manager receive the system configuration.
8. Click on
Unit in the left-hand panel.
9. Check that the list of units shown in the right-hand panel is correct.
10.Proceed to
Adding a WAN3
IP Office Installation
IP Office
unit.
(optional).
Module.
15-601042 Issue 20b (16 July 2009)
Page 128

Advertisement

Table of Contents
loading

Table of Contents