Mazda RX-8 Workshop Manual page 1449

2011 - rx-8
Hide thumbs Also See for RX-8:
Table of Contents

Advertisement

1Toe control link ball joint
(See
Toe Control Link Ball Joint Installation
2Toe control link
3Dust boot
(See
Dust Boot Installation
Dust Boot Installation Note
1. Wipe the grease off the ball joint stud.
2. Fill the inside of the new dust boot with grease.
3. Using the SST, install the dust boot to the ball joint.
4. Wipe off the excess grease.
Toe Control Link Ball Joint Installation Note
1. Install the toe control link ball joint so that the ball joint stud projection is within -2—4 mm
{-0.08—0.15 in}.
Note.)
Note.)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2011 rx-8

Table of Contents