Mazda RX-8 Workshop Manual page 1185

2011 - rx-8
Hide thumbs Also See for RX-8:
Table of Contents

Advertisement

< Previous Next >
2011 - RX-8 - Engine
NEUTRAL SWITCH INSPECTION [13B-MSP]
NOTE:
Before performing the following inspection, make sure to follow the troubleshooting
flowchart. (See
Continuity Inspection
1. Remove the battery cover. (See
2. Disconnect the negative battery cable.
3. Remove the neutral switch. (See
4. Verify that the continuity between neutral switch terminals A and B is as indicated in the
table.
If there is no malfunction, perform the "Circuit Open/Short Inspection". (See
Circuit Open/Short
If there is any malfunction, replace the neutral switch. (See
REMOVAL/INSTALLATION
Measurement condition
Push the rod
Except above
FOREWORD
[13B-MSP].)
BATTERY REMOVAL/INSTALLATION
NEUTRAL SWITCH REMOVAL/INSTALLATION
Inspection.)
[P66M-D].)
Continuity
No continuity
Continuity detected
[13B-MSP].)
[P66M-D].)
NEUTRAL SWITCH

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2011 rx-8

Table of Contents