NEC Express 5800 User Manual page 645

Express5800 series
Hide thumbs Also See for Express 5800:
Table of Contents

Advertisement

13. Check test status.
Enter <stat> on the command line of the System Diagnostics screen to check the
executing status of the test.
The following is an example of screen using the command.
TeDoLi> stat
Status
Time
Total of tests : 15
Running
Pass
Failure
Warning
TeDoLi> statv 16
----------------------
BM/MB/PCI8/Port1(eth0)
----------------------
Test Count
Progress
·
Status: one of the following three statuses is displayed. This status is the status of TeDoLi
itself.
Idle status
Executing status
Waiting for Termination
status
·
Time: elapsed time of the test being executed (elapsed time from entering <exec> command)
is displayed. The time is updated until all the tests are completed.
·
Total of tests shows the total number of tests. Test types are sorted as follows depending on
the executed test results.
Pass:
: Number of tests ended normally
Failure
: Number of tests ended with error
Warning : Number of tests ended with warning (# This is an information expanded
·
Use <statv> command to check the detailed status (number of executed times and progress
of each time) for each test.
·
Test status can also be checked by using <list> on the test device list.
·
Use <term> command to terminate the current test forcibly.
,Refer to Command List for more details on each command.
: Executing
: 000:00:44
: 15
: 0
: 0
: 0
: 74
: 49%
: Status before starting the test. Or the status after
: Status that the test is being executed.
: Status that waiting for the completion of the test.
in the future and is not supported as of yet).
the completion of test.
645
Operation and Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents