Basic Operation; Installing/Removing The Front Bezel - NEC Express5800/340Hb-R N8800-047F User Manual

Hide thumbs Also See for Express5800/340Hb-R N8800-047F:
Table of Contents

Advertisement

2-28 General Description

BASIC OPERATION

This section explains the basic operation of the NEC Express5800/ft series.

Installing/Removing the Front Bezel

Install the server modules in the rack assembly, and then install the front bezel.
To handle the server module or components in it, remove the front bezel from the server.
IMPORTANT:
expert knowledge on the server to install, remove, or replace the CPU module, PCI module,
and expansion PCI module. NEC is not responsible for any machine or component defects or
bad influences resulting from the operation of the server subject to the installation or removal
made by yourself.
The front bezel covers the POWER switch and internal devices such as CD-ROM drive and hard
disk drive of the server.
Installation
1.
If the rack has a front door, open the front door.
2.
Fit the clip of the front bezel to the ball stud of the chassis, and carefully push them in.
3.
If the rack has a front door, close the front door.
Request a maintenance engineer of your service representative having the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/340hb-r n8800-073f

Table of Contents