Installation Tasks

1. Install the clip nuts. Install M6 clip nuts in the following locations on EIA rails:
For improved stability, orient the clip nuts as shown (i.e., orient the flanges
horizontally):
D000140-001 B
Figure 1-8 Clip Nut Installation Locations
Figure 1-9 Clip Nut Orientation
Installation
12800-040 Installation
1-13