FRU Replacement
QLogic 12300
3.
Connect Ethernet and Serial cables (managed 12200 only).
4.
Connect AC power.
5.
If applicable, change the switch, gateway and subnet mask addresses to a
new network address.
6.
Cable all applicable IB ports.
QLogic 12300
Chassis Replacement
FRU part number:
Standard 36-port chassis: 12300-BS01
12300 18-port chassis: 12300-BS18
Removal Procedures
1.
Power down the switch by unplugging AC power.
2.
Remove all applicable IB, Ethernet and Serial cables. Set these aside for
reinstalling the replacement switch.
3.
Remove the switch from the rack. Keep all rail hardware installed in the rack.
4.
Remove the hat rails from the switch. Set these aside for for reinstalling the
replacement switch.
Replacement Procedures
1.
Install the hat rails to the switch.
2.
Rack mount the switch in the existing rails on the rack.
3.
Connect Ethernet and Serial cables.
4.
Connect AC power.
5.
Change the switch, gateway and subnet mask addresses to a new network
address.
6.
Cable all applicable IB ports.
Fan/Power Supply Replacement
FRU part number:12300-PS01
NOTE:
These fan/power supplies are to be used exclusively with the QLogic 12300
D-2
S
D000140-001 B