Installation Tasks - Qlogic SilverStorm 9020 Quick Start Manual

Hide thumbs Also See for SilverStorm 9020:
Table of Contents

Advertisement

Step 4.
Verify that the equipment shipped matches the packing list.
Tools and Equipment Required
An ESD wrist strap
A #2 Phillips screwdriver
Pen (felt-tip) to mark the mounting holes on the rack

Installation Tasks

To perform the actual switch installation, the site implementation engineer must perform the following tasks, which are detailed
in this section.
Step 1.
Check the installation site to verify the installation of cabinet
power feeds, rails, and grounding.
Step 2.
Inspect the packaging and equipment for any shipping damage.
Any shipping damage should be reported to the shipping company. Only
unpack the the equipment if there is no shipping damage.
Step 3.
Record the equipment serial numbers.
Step 4.
Physically install the switch in the rack.
Step 5.
Install InfiniBand (IB) or IB/Fiber Optic cables between the switch
and network devices.
Step 6.
Install intra-cabinet power and grounding cables for the switch.
Step 7.
Power up the switch.
Step 8.
Change the default system IP address (192.168.100.9) and
gateway IP address (255.255.255.0) for the master management module.
Step 9.
Add the equipment to the network.